Lifting injections under filigree tunnel shells for the construction of the 2nd Munich S-Bahn main line
Contact: | M.Sc. Martin Sailer |
Dr.-Ing. habil. Jochen Fillibeck |
Injection concept
Influence of the lifting injections at different distances to the tunnel 2D-FE calculations (deformation IuI)
-->Development of an injection concept
Step 1: Lifting at a great distance from the tunnel (Case 1, vertical ovalization)
Step 2: Lifting injections laterally and below the tunnel (case 2 and 3, horizontal ovalization)
Step 3: Repeat steps 1 and 2
--> Gradual lifting of the tunnel