example: deep situated station “Marienhof”
extension of the existing urban rail network by the parallel running 2. S-Bahn-Stammstrecke
plan of the station marienhof
Station Marienhof in open and closed coveraged type.
45 m deep excavation directly next to an existing subway
situation of the excavation and FE-calculations
2-dimensional FE-Model for the analysis of forces and displacements
in the soil and the interaction with the tunnel and the existing development